2011:Field 2/12/2011: Difference between revisions
m (Field 2/12/2011 moved to 2011:Field 2/12/2011) |
No edit summary |
||
Line 1: | Line 1: | ||
Members present: | Members present: Shayna, Jason | ||
<br> | Mentors present: Amy<br> | ||
<br>Members Attending Next Meeting: | |||
Tasks Completed: | <br>Tasks Completed: | ||
Task 1 - | Task 1 - Re-cut poles to 16 inches<br> | ||
Task 2 - | Task 2 - Wrap post bottoms with solid material<br> | ||
Task 3 - Sand down inside of feeder plates<br> | |||
Task 4 - Make sure we have enough Velcro <br> | |||
Tasks In Progress: | <br>Tasks In Progress: | ||
Task 1 - | Task 1 - | ||
Task 2 - | Task 2 - | ||
<br>-------------------------------------------------------------------------------- | <br>-------------------------------------------------------------------------------- | ||
Tasks to Complete: | Tasks to Complete: | ||
Task 1 - | Task 1 - Place Refelective Tape on poles | ||
Task 2 - | Task 2 - Drill holes for rail alignment | ||
Task 3 - Mount post toppers | |||
Task 4 - Determine/Construct method to keep lane dividers in place | |||
Task 5 - Mounting system on player stations for power/connectivity | |||
Task 6 - Drill holes in each player station for cords | |||
- | Task 7 - Drill 1 hole in each piece of Lexan for securing | ||
Task 8 - Tape inside of feeder plates | |||
Task 9 - Sensor plate | |||
<br> | |||
---- | |||
Images & Additional Updates: | Images & Additional Updates: | ||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | (Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) |
Latest revision as of 19:33, 12 February 2011
Members present: Shayna, Jason
Mentors present: Amy
Members Attending Next Meeting:
Tasks Completed:
Task 1 - Re-cut poles to 16 inches
Task 2 - Wrap post bottoms with solid material
Task 3 - Sand down inside of feeder plates
Task 4 - Make sure we have enough Velcro
Tasks In Progress:
Task 1 -
Task 2 -
--------------------------------------------------------------------------------
Tasks to Complete:
Task 1 - Place Refelective Tape on poles
Task 2 - Drill holes for rail alignment
Task 3 - Mount post toppers
Task 4 - Determine/Construct method to keep lane dividers in place
Task 5 - Mounting system on player stations for power/connectivity
Task 6 - Drill holes in each player station for cords
Task 7 - Drill 1 hole in each piece of Lexan for securing
Task 8 - Tape inside of feeder plates
Task 9 - Sensor plate
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)