2011:Mechanical 2 1.13: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Mechanical2 (talk | contribs) No edit summary |
Mechanical2 (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
'''End time: 9:00 p.m.''' | '''End time: 9:00 p.m.''' | ||
'''Members present:''' | '''Members present:''' | ||
Brianna M.<br> | Brianna M.<br> | ||
Line 25: | Line 25: | ||
Mrs. W.<br> | Mrs. W.<br> | ||
'''Members Attending Next Meeting:''' | '''Members Attending Next Meeting:''' | ||
Brianna M.<br> | Brianna M.<br> | ||
Line 33: | Line 33: | ||
Alex W.<br> | Alex W.<br> | ||
Mrs. W. | |||
Mr | Mr. W. | ||
= Tasks Completed = | = Tasks Completed = | ||
Line 59: | Line 53: | ||
= Tasks to Complete = | = Tasks to Complete = | ||
*Mr. K can't make it Friday, so we should be working on sketches with measured dimensions using the techniques the team worked on last night.<br>We can compare different concepts that way.<br>We can also experiment with acquiring game pieces with some very simple mockups. | *Mr. K can't make it Friday, so we should be working on sketches with measured dimensions using the techniques the team worked on last night.<br>We can compare different concepts that way.<br>We can also experiment with acquiring game pieces with some very simple mockups. | ||
*Materials Needed | *Materials Needed | ||
<br> | <br> |
Latest revision as of 18:39, 14 January 2011
Attendance
Start time: 6:30 p.m.
End time: 9:00 p.m.
Members present:
Brianna M.
Ciana R.
Alex W.
Jon G.
Ethan M.
Jake K.
Mr. K.
Mr. W.
Mrs. W.
Members Attending Next Meeting:
Brianna M.
Ciana R.
Alex W.
Mrs. W.
Mr. W.
Tasks Completed
- Determined approximate size for spacer (medium size, 1 1/2 to 1 3/4 in)
- Investigating lenghts and angles of manipulator
- using physical model
- about 8-9 inches in length
Tasks In Progress
- determine tubing (surgical)
- making game pieces in inventor
- figuring out if we should use 1 or 2 motors
- possibly 1 of the arms on the manipulator moving able to grasp the tubes
Tasks to Complete
- Mr. K can't make it Friday, so we should be working on sketches with measured dimensions using the techniques the team worked on last night.
We can compare different concepts that way.
We can also experiment with acquiring game pieces with some very simple mockups. - Materials Needed