2011:Mechanical 2 1.15: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 60: Line 60:
*tbd
*tbd


= '''DAY 2: 1/15/11''' =
= '''DAY 2: 1/15/11''' =


== Attendance  ==
== Attendance  ==
Line 66: Line 66:
'''Start time: '''11:00 am  
'''Start time: '''11:00 am  


'''End time: '''  
'''End time: ''' 9:00 p.m.


'''Members present:'''  
'''Members present:'''  


Brianna M.
Brianna M.  


Ciana R.
Ciana R.  


Jon G.
Jon G.  


Alex W.
Alex W.  


Mr. K.
Mr. K.  


Mrs. W.  
Mrs. W.  


Mr. W.
Mr. W.  


<br>'''Members Attending Next Meeting:'''


'''Members Attending Next Meeting:'''
Brianna M.


Brianna M.
Ciana R.  


Ciana R.
Alex W.  


Alex W.
Jon G.  


Jon G.
Mr. W.  


Mr. W.
Mrs. W.  
 
Mrs. W.


Mr. K.<br>&nbsp;'''Tasks Completed'''
Mr. K.<br>&nbsp;'''Tasks Completed'''  


*Using same idea as yesterday, but now using wheels instead of tubing
*Using same idea as yesterday, but now using wheels instead of tubing  
*Determined angle to be 50 degrees  
*Determined angle to be 50 degrees  
*Determined height from ground, 1 1/2" which worked much better than 2"
*Determined height from ground, 1 1/2" which worked much better than 2"  
*speeed of wheels
*speeed of wheels


'''Tasks In Progress'''  
'''Tasks In Progress'''  


*Finding shapes for frame
*Finding shapes for frame  
*Roughing up tires with sandpaper to increase coefficent friction
*Roughing up tires with sandpaper to increase coefficent friction  
*Telescope vs. folding for starting configuringtion <br>
*Telescope vs. folding for starting configuringtion <br>



Revision as of 19:09, 15 January 2011

Attendance

Start time: 6:00

End time: 9:30

Date: 1/14/11

Members present:

Brianna M.

Ciana R.

Alex W.

Mr. W

Mrs. W

Members Attending Next Meeting:

Brianna M.

Ciana R.

Alex W

Mr. W

Mrs. W

Mr. K.

Tasks Completed

  • Determined length and angle of gripper   
  • 1st test 
  •       A: 8" (no) 7"(no) 6" ( worked poorly, and we had to push the tube in)
  •       B: 8"
  •       D: 2"
  • 2nd test:
  •       A: 8"(no) 7"(no) 6"(worked poorly, and we had to push the tube in)
  •      B: 10"
  •      D: 2"
  • Finshed game peices on inventor  

Tasks In Progress

  • tubbing or not
  • manipulator prototyping  
  • sketching manipulators

Tasks to Complete

  • tbd

Materials Needed

  • tbd

DAY 2: 1/15/11

Attendance

Start time: 11:00 am

End time:  9:00 p.m.

Members present:

Brianna M.

Ciana R.

Jon G.

Alex W.

Mr. K.

Mrs. W.

Mr. W.


Members Attending Next Meeting:

Brianna M.

Ciana R.

Alex W.

Jon G.

Mr. W.

Mrs. W.

Mr. K.
 Tasks Completed

  • Using same idea as yesterday, but now using wheels instead of tubing
  • Determined angle to be 50 degrees
  • Determined height from ground, 1 1/2" which worked much better than 2"
  • speeed of wheels

Tasks In Progress

  • Finding shapes for frame
  • Roughing up tires with sandpaper to increase coefficent friction
  • Telescope vs. folding for starting configuringtion

Tasks to Complete

  • tbd

Materials Needed

  • tbd