Members present: Amy, Josh, Shayna, Jason, Manuel
Members present: Shayna, Jason, Manuel, Kieran 


<br>Members Attending Next Meeting:  
Mentors present: Amy, Josh


<br>Members Attending Next Meeting: Jason, Manuel, Amy


<br>


<br>


 
----
--------------------------------------------------------------------------------


Tasks Completed:  
Tasks Completed:  


Task 1 - Cut PVC
Task 1 - Cut PVC  
 
Task 2 - Assembled 1 Tower Base


Task 2 - Assembled 1 Tower Base


<br>


--------------------------------------------------------------------------------  
----


Tasks In Progress:  
Tasks In Progress:  


Task 1 - Assembling Scoring Grids
Task 1 - Assembling Scoring Grids  


Task 2 -  
Task 2 -  
Line 29: Line 31:
Tasks to Complete:  
Tasks to Complete:  


Task 1 - Build Alliance Station Walls
Task 1 - Build Alliance Station Walls  
 
Task 2 - Finish Assembling Bases
 


Task 2 - Finish Assembling Bases


<br>


<br>


--------------------------------------------------------------------------------  
----


Materials Needed:  
Materials Needed:  
Line 43: Line 45:
<br>Item 1 -  
<br>Item 1 -  


Item 2 -
Item 2 -  


--------------------------------------------------------------------------------  
----


Images &amp; Additional Updates:  
Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Revision as of 04:47, 17 January 2011

Members present: Shayna, Jason, Manuel, Kieran 

Mentors present: Amy, Josh


Members Attending Next Meeting: Jason, Manuel, Amy




Tasks Completed:

Task 1 - Cut PVC

Task 2 - Assembled 1 Tower Base



Tasks In Progress:

Task 1 - Assembling Scoring Grids

Task 2 -


--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Build Alliance Station Walls

Task 2 - Finish Assembling Bases




Materials Needed:


Item 1 -

Item 2 -


Images & Additional Updates: