2011:Controls 1.20: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 11: Line 11:
= Tasks Completed  =
= Tasks Completed  =


*task- Order list for controls<br>
*task- Order list for controls<br>  
**sub-task  
**sub-task  
**sub-task  
**sub-task  
*task
*task- Control delivar system - two side scetions fold pward into vertical postion with a meatl sheath covering the middle<br>


= Tasks In Progress  =
= Tasks In Progress  =


*task- Potential portability of control system (possibly two sections fold up in vertical postion with a sheet metal sheath covering the middle)<br>  
*task- <br>  
**sub-task  
**sub-task  
**sub-task  
**sub-task  

Revision as of 17:02, 20 January 2011

Attendance

Start time: 6:30

End time: N/A

Members present: J.P, Crystal, Gafei, Quinten, Josh

Members Attending Next Meeting:

Tasks Completed

  • task- Order list for controls
    • sub-task
    • sub-task
  • task- Control delivar system - two side scetions fold pward into vertical postion with a meatl sheath covering the middle

Tasks In Progress

  • task-
    • sub-task
    • sub-task
  • task- Measurments for control base

Tasks to Complete

  • task- Spacial design of conrol system (which functional devices go where on the interface)
    • sub-task
    • sub-task
  • task-Materials to use for the control system (metal, circutry, etc...)

Materials Needed

  • task
    • sub-task
    • sub-task
  • task