2011:Electrical Main 1.23: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 12: Line 12:


*Selected encoders  
*Selected encoders  
**We chose the E4P with 360 CPR disk
**We chose the E4P with 360 CPR disk  
**Is able to rotate with 0.5 degrees of accuracy if using quadrature output
**Is able to rotate with 0.5 degrees of accuracy if using quadrature output  
**Using two encoders for redundancy  
**Using two encoders for redundancy  
*Created schematics for photoelectric sensor (Banner) <br>
*Created schematics for photoelectric sensor (Banner)  
*
 
[[Image:PhotoSensorSet2.png]]
 
*LED 2 is just an adjustment LED


= Tasks In Progress =  
= Tasks In Progress =  

Revision as of 14:11, 23 January 2011

Attendance

Start time: 10:30

End time:

Members present: Alex Rozanov, Matthieu Dora

Members Attending Next Meeting: Alex Rozanov, Dave B

Tasks Completed

  • Selected encoders
    • We chose the E4P with 360 CPR disk
    • Is able to rotate with 0.5 degrees of accuracy if using quadrature output
    • Using two encoders for redundancy
  • Created schematics for photoelectric sensor (Banner)

PhotoSensorSet2.png

  • LED 2 is just an adjustment LED

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

  • task
    • sub-task
    • sub-task
  • task

Materials Needed

  • task
    • sub-task
    • sub-task
  • task