2011:FieldMasterTaskList: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
== 2011 Game Elements  ==
= 2011 Game Elements  =


*<strike>Finish cutting PVC</strike>  
*<strike>Finish cutting PVC</strike>  
Line 17: Line 17:
<br>  
<br>  


== Alliance Station Walls  ==
= Alliance Station Walls  =


*<strike>Cut 2x4's to proper length </strike>
*<strike>Cut 2x4's to proper length </strike>
Line 28: Line 28:
*<strike>Assemble the sections of the new alliance station walls</strike>
*<strike>Assemble the sections of the new alliance station walls</strike>


== Painting  ==
== Hardware Connections ==
*Pre-fit lexan panels
*Pre-drill holes for connecting bolts
*Pre-fit player station assemblies
*Put together entire wall assembly prior to Rally
 
= Painting  =


*<strike>Paint alliance station wall bottoms</strike>
*<strike>Paint alliance station wall bottoms</strike>
Line 36: Line 42:
*<strike>Paint Player Station Legs and Frames</strike>
*<strike>Paint Player Station Legs and Frames</strike>


== Other Items  ==
= Other Items  =


*Design New Pit Set-up  
*Design New Pit Set-up  

Revision as of 18:45, 24 January 2011

2011 Game Elements

  • Finish cutting PVC
  • Glue remaining PVC sections together
  • Attach retention plates to PVC outriggers
  • Finish cutting tower base supports
  • Assemble 3 remaining tower bases
  • Cut out the hole in the 1 remaining floor protector
  • Order game pieces
    • 14 Red Triangle
    • 14 Blue Square
    • 14 White Circle
    • 8 Yellow Ubertube
  • Cut Scrap Pieces of carpet to cover the floor protectors
  • Cut plywood pieces for the feeder slots in alliance walls


Alliance Station Walls

  • Cut 2x4's to proper length
    • Wall Uprights
    • Wall Cross Members
    • Player Station Legs
    • Player Station Frames
  • Cut plywood player station tops
  • Cut plywood corner brackets
  • Assemble the sections of the new alliance station walls

Hardware Connections

  • Pre-fit lexan panels
  • Pre-drill holes for connecting bolts
  • Pre-fit player station assemblies
  • Put together entire wall assembly prior to Rally

Painting

  • Paint alliance station wall bottoms
  • Paint alliance station wall frames
  • Paint tower bases
  • Paint lane dividers
  • Paint Player Station Legs and Frames

Other Items

  • Design New Pit Set-up
  • Repair the damaged areas of the crate
  • Set-up the cart for the 2011 robot
  • Clean up scrap materials in the new closet
  • Organize the new closet
  • Look into new ways to build field rails for Rally