2011:2/1/2011: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Programming (talk | contribs) (New page: '''Drivetrain''' The<br> <br>'''Arm/Manipulator''' The <br> '''Minibot/Deployer''' The <br>'''Electrical Main''' The<br> <br>'''Electrical Controls''' The<br> <br>'''Programming''...) |
Programming (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
'''Drivetrain''' | '''Drivetrain''' | ||
Drivetrain is complete. Spacers for sprockets are here and need to be put on.<br> | |||
<br>'''Arm/Manipulator''' | <br>'''Arm/Manipulator''' | ||
All the arm parts and most of the tower parts are out for manufacture. Somewhere between 1 and 20 small details need to be figured out for manufacture, but those should be done soon. Mounting points for deployer need to be integrated. | |||
<br> '''Minibot/Deployer''' | |||
The | |||
<br>'''Electrical Main''' | |||
<br> | The<br> | ||
<br>'''Electrical Controls''' | |||
<br>'''Programming''' | The<br> | ||
<br>'''Programming''' | |||
The<br> | The<br> |
Revision as of 17:03, 1 February 2011
Drivetrain
Drivetrain is complete. Spacers for sprockets are here and need to be put on.
Arm/Manipulator
All the arm parts and most of the tower parts are out for manufacture. Somewhere between 1 and 20 small details need to be figured out for manufacture, but those should be done soon. Mounting points for deployer need to be integrated.
Minibot/Deployer
The
Electrical Main
The
Electrical Controls
The
Programming
The