2011:Mechanical 2 2.8: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 11: Line 11:
= Tasks Completed  =
= Tasks Completed  =


&nbsp;&nbsp; - Do we have a sprocket guard figured out yet for the top of the arm?<br> Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
&nbsp;&nbsp; - Do we have a sprocket guard figured out yet for the top of the arm?<br> Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.  


&nbsp;- Deployer, arm park side side, shield and support ALEX need 4 drawings<br>&nbsp;- Draw bridge TOM / Alex
&nbsp;- Deployer, arm park side side, shield and support ALEX need 4 drawings<br>&nbsp;- Draw bridge TOM / Alex  


&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Draw bridge deploy<br>&nbsp;- Side electrical board supports, and place board CIANNA<br>&nbsp;- Belly pan
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Draw bridge deploy<br>&nbsp;- Side electrical board supports, and place board CIANNA<br>&nbsp;- Belly pan  


1- sensor brackets and flags 3 Brianna
1- sensor brackets and flags 3 Brianna  


&nbsp;- arm release trigger
&nbsp;- arm release trigger  


&nbsp;- parts inventory
&nbsp;- parts inventory  


2- jack shaft details
2- jack shaft details  


&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; encoder on the jack shaft
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; encoder on the jack shaft  


&nbsp;- ASSEMBLE
&nbsp;- ASSEMBLE  


&nbsp;- put in electrical components and weight cg work.CIANNA
&nbsp;- put in electrical components and weight cg work.CIANNA  


3- MINI BOT HOLDER
3- MINI BOT HOLDER  


4- Light tower mount. Gabe
4- Light tower mount. Gabe  


&nbsp;- Deploy side deployer mount, sheet metal  
&nbsp;- Deploy side deployer mount, sheet metal  
&nbsp;- Redesign Arm shoulder support stiffener rear


= Tasks In Progress  =
= Tasks In Progress  =

Revision as of 17:38, 8 February 2011

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

   - Do we have a sprocket guard figured out yet for the top of the arm?
Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.

 - Deployer, arm park side side, shield and support ALEX need 4 drawings
 - Draw bridge TOM / Alex

             Draw bridge deploy
 - Side electrical board supports, and place board CIANNA
 - Belly pan

1- sensor brackets and flags 3 Brianna

 - arm release trigger

 - parts inventory

2- jack shaft details

                encoder on the jack shaft

 - ASSEMBLE

 - put in electrical components and weight cg work.CIANNA

3- MINI BOT HOLDER

4- Light tower mount. Gabe

 - Deploy side deployer mount, sheet metal

 - Redesign Arm shoulder support stiffener rear

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

  • task
    • sub-task
    • sub-task
  • task

Materials Needed

  • task
    • sub-task
    • sub-task
  • task