Members present: Jason, Manuel, Shayna
Members present: Jason, Manuel, Shayna  


Mentors present: Amy
Mentors present: Amy  


<br>Members Attending Next Meeting:  
<br>Members Attending Next Meeting:  
Line 13: Line 13:
Tasks Completed:  
Tasks Completed:  


Task 1 - Built structure for 1 shelving unit
Task 1 - Built structure for 1 shelving unit  


Task 2 -  
Task 2 -  
Line 23: Line 23:
Tasks In Progress:  
Tasks In Progress:  


Task 1 - Cut shelves for shelving unit
Task 1 - Cut shelves for shelving unit  


Task 2 -  
Task 2 -  
Line 31: Line 31:
Tasks to Complete:  
Tasks to Complete:  


Task 1 - Build second shelving unit
Task 1 - Build second shelving unit  


Task 2 - Place Refelective Tape on poles
Task 2 - Place Refelective Tape on poles  


Task 3 - Drill holes for rail alignment
Task 3 - Drill holes for rail alignment  


Task 4 - Create plates for rail rigidity
Task 4 - Create plates for rail rigidity  


Task 5 - Determine what to do for extra 2"&nbsp;pole length
Task 5 - Determine what to do for extra 2"&nbsp;pole length  


Task 6 - Wrap post bottoms with solid material
Task 6 - Wrap post bottoms with solid material  


Task 7 - Mount post toppers
Task 7 - Mount post toppers  


Task 8 - Determine/Construct method to keep line dividers in place
Task 8 - Determine/Construct method to keep lane dividers in place  


Task 9 - Mounting system on player stations for power/connectivity
Task 9 - Mounting system on player stations for power/connectivity  


Task 10 - Drill holes in each player station for cords
Task 10 - Drill holes in each player station for cords  


Task 11 - Drill 1 hole in each piece of Lexan for securing
Task 11 - Drill 1 hole in each piece of Lexan for securing  


Task 12 - Sand down inside of feeder plates
Task 12 - Sand down inside of feeder plates  


<br>
<br>
Line 63: Line 63:
Materials Needed:  
Materials Needed:  


<br>Item 1 - 4x4s
<br>Item 1 - 4x4s  


Item 2 - Hardware for rails
Item 2 - Hardware for rails  


----
----

Latest revision as of 05:53, 9 February 2011

Members present: Jason, Manuel, Shayna

Mentors present: Amy


Members Attending Next Meeting:




Tasks Completed:

Task 1 - Built structure for 1 shelving unit

Task 2 -



Tasks In Progress:

Task 1 - Cut shelves for shelving unit

Task 2 -


--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Build second shelving unit

Task 2 - Place Refelective Tape on poles

Task 3 - Drill holes for rail alignment

Task 4 - Create plates for rail rigidity

Task 5 - Determine what to do for extra 2" pole length

Task 6 - Wrap post bottoms with solid material

Task 7 - Mount post toppers

Task 8 - Determine/Construct method to keep lane dividers in place

Task 9 - Mounting system on player stations for power/connectivity

Task 10 - Drill holes in each player station for cords

Task 11 - Drill 1 hole in each piece of Lexan for securing

Task 12 - Sand down inside of feeder plates




Materials Needed:


Item 1 - 4x4s

Item 2 - Hardware for rails


Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)