2011:Mechanical 2 2.9: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
= Attendance  =
= Attendance  =


'''Start time:'''
'''Start time:'''  


'''End time:'''
'''End time:'''  


'''Members present:'''
'''Members present:'''  


'''Members Attending Next Meeting:'''
'''Members Attending Next Meeting:'''  


= Tasks   =
= Tasks   =


''' As of yesterday we won't be able to release any more parts to Harris and recieve them in time to build robot by Saterday 2/12, so alternate manufacturing techniques need to be planned.'''
''' As of yesterday we won't be able to release any more parts to Harris and recieve them in time to build robot by Saterday 2/12, so alternate manufacturing techniques need to be planned.'''  


- Do we have a sprocket guard figured out yet for the top of the arm?<br>Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.  
- Do we have a sprocket guard figured out yet for the top of the arm?<br>Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.  


- '''NEED TO MAKE PARTS AT SCHOOL, '''Draw bridge deploy
- '''NEED TO MAKE PARTS AT SCHOOL, '''Draw bridge deploy  


'''- NEED TO MAKE PARTS AT SCHOOL, '''MINI BOT HOLDER<br>'''- NEED TO MAKE PARTS AT SCHOOL, '''Side electrical board supports, and place board CIANNA<br>'''- NEED TO MAKE PARTS AT SCHOOL, '''Belly pan
'''- NEED TO MAKE PARTS AT SCHOOL, '''MINI BOT HOLDER<br>'''- NEED TO MAKE PARTS AT SCHOOL, '''Side electrical board supports, and place board CIANNA<br>'''- NEED TO MAKE PARTS AT SCHOOL, '''Belly pan  


'''- NEED TO MAKE PARTS AT SCHOOL, '''sensor brackets and flags 3 Brianna
'''- NEED TO MAKE PARTS AT SCHOOL, '''sensor brackets and flags 3 Brianna  


- arm release trigger
- arm release trigger  


- parts inventory
- parts inventory  


'''- NEED TO MAKE PARTS AT SCHOOL, '''jack shaft details
'''- NEED TO MAKE PARTS AT SCHOOL, '''jack shaft details  


&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; encoder on the jack shaft
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; encoder on the jack shaft  


- ASSEMBLE
- ASSEMBLE  


- put in electrical components and weight cg work.CIANN. <br>'''- NEED TO MAKE PARTS AT SCHOOL, '''Light tower mount. Gabe
- put in electrical components and weight cg work.CIANN. <br>'''- NEED TO MAKE PARTS AT SCHOOL, '''Light tower mount. Gabe  


'''- NEED TO MAKE PARTS AT SCHOOL, '''Deploy side deployer mount, sheet metal
'''- NEED TO MAKE PARTS AT SCHOOL, '''Deploy side deployer mount, sheet metal  


'''- NEED TO MAKE PARTS AT SCHOOL, '''Redesign Arm shoulder support stiffener rear
'''- NEED TO MAKE PARTS AT SCHOOL, '''Redesign Arm shoulder support stiffener rear  
 
'''- NEED TO MAKE PARTS AT SCHOOL, '''Detail and build legs and plugs.


= Materials Needed  =
= Materials Needed  =

Revision as of 07:42, 9 February 2011

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks 

 As of yesterday we won't be able to release any more parts to Harris and recieve them in time to build robot by Saterday 2/12, so alternate manufacturing techniques need to be planned.

- Do we have a sprocket guard figured out yet for the top of the arm?
Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.

- NEED TO MAKE PARTS AT SCHOOL, Draw bridge deploy

- NEED TO MAKE PARTS AT SCHOOL, MINI BOT HOLDER
- NEED TO MAKE PARTS AT SCHOOL, Side electrical board supports, and place board CIANNA
- NEED TO MAKE PARTS AT SCHOOL, Belly pan

- NEED TO MAKE PARTS AT SCHOOL, sensor brackets and flags 3 Brianna

- arm release trigger

- parts inventory

- NEED TO MAKE PARTS AT SCHOOL, jack shaft details

                encoder on the jack shaft

- ASSEMBLE

- put in electrical components and weight cg work.CIANN.
- NEED TO MAKE PARTS AT SCHOOL, Light tower mount. Gabe

- NEED TO MAKE PARTS AT SCHOOL, Deploy side deployer mount, sheet metal

- NEED TO MAKE PARTS AT SCHOOL, Redesign Arm shoulder support stiffener rear

- NEED TO MAKE PARTS AT SCHOOL, Detail and build legs and plugs.

Materials Needed

  • task
    • sub-task
    • sub-task
  • task