2011:Mechanical 2 2.9: Difference between revisions
Mechanical2 (talk | contribs) No edit summary |
Mechanical2 (talk | contribs) No edit summary |
||
Line 11: | Line 11: | ||
= Tasks = | = Tasks = | ||
'''As of yesterday we won't be able to release any more parts to Harris and receive them in time to build robot by Saturday 2/12, so alternate manufacturing techniques need to be planned.''' - '''NEED TO MAKE PARTS AT SCHOOL, '''Draw bridge deploy | '''As of yesterday we won't be able to release any more parts to Harris and receive them in time to build robot by Saturday 2/12, so alternate manufacturing techniques need to be planned.''' | ||
- '''NEED TO MAKE PARTS AT SCHOOL, '''Draw bridge deploy | |||
'''- NEED TO MAKE PARTS AT SCHOOL, '''MINI BOT HOLDER<br>'''- NEED TO MAKE PARTS AT SCHOOL, '''Side electrical board supports. | '''- NEED TO MAKE PARTS AT SCHOOL, '''MINI BOT HOLDER<br>'''- NEED TO MAKE PARTS AT SCHOOL, '''Side electrical board supports. |
Revision as of 09:17, 9 February 2011
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks
As of yesterday we won't be able to release any more parts to Harris and receive them in time to build robot by Saturday 2/12, so alternate manufacturing techniques need to be planned.
- NEED TO MAKE PARTS AT SCHOOL, Draw bridge deploy
- NEED TO MAKE PARTS AT SCHOOL, MINI BOT HOLDER
- NEED TO MAKE PARTS AT SCHOOL, Side electrical board supports.
- NEED TO MAKE PARTS AT SCHOOL, Belly pan stiffeners and side covers.
- NEED TO MAKE PARTS AT SCHOOL, sensor brackets and flags 3
- NEED TO MAKE PARTS AT SCHOOL, jack shaft details
(encoder on the jack shaft)
- NEED TO MAKE PARTS AT SCHOOL, Light tower mount. Gabe
- NEED TO MAKE PARTS AT SCHOOL, Deploy side deployer mount.
- NEED TO MAKE PARTS AT SCHOOL, Detail and build legs and plugs.
- NEED TO MAKE PARTS AT SCHOOL?????, Redesign Arm shoulder support stiffener rear.
- Do we have a sprocket guard figured out yet for the top of the arm?
(Safty in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.)
- Assemble
- put in electrical components and weight cg work.CIANN.
- arm release trigger. Status?
- parts inventory
Materials Needed
- task
- sub-task
- sub-task
- task