2011:Check Lists: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Programming (talk | contribs) (New page: === '''Pre-Match Check List''' === *'''Main Bot''' **Properly park arm **Place Uber tube in fully **Attach velcro to manipulator **For line following: only sensor must be green **Al...) |
No edit summary |
||
Line 9: | Line 9: | ||
**Make sure side plastic panels are not in the way of the draw bridge | **Make sure side plastic panels are not in the way of the draw bridge | ||
**Pull out BOTH safety pins | **Pull out BOTH safety pins | ||
''To be added: Power on, alignment details, and gyro interaction'' | |||
*'''Mini Bot''' | *'''Mini Bot''' |
Revision as of 12:45, 25 February 2011
Pre-Match Check List
- Main Bot
- Properly park arm
- Place Uber tube in fully
- Attach velcro to manipulator
- For line following: only sensor must be green
- Align robot will pegs and perpendicular to wall
- Make sure side plastic panels are not in the way of the draw bridge
- Pull out BOTH safety pins
To be added: Power on, alignment details, and gyro interaction
- Mini Bot
- TBD: put in info about the switch positions
- Controls
- Select Autonomous Mode (press A)
- Select Autonomous Delay (turn dial)
- Check broken switches
Post-Match Check List
- Push deployer back in so latch catches
- Put in deployer's saftey pin
- Pull up draw bridge
- Put in draw bridge's safety pin
- Park arm and manipulator
Pit Check List
- Setup Mini-bot (see Pre-Match Check List)
- Follow Post-Match Check list
- Put in BOTH safety pins