| Mount and connect second turret sensor
| Mount and connect second turret sensor
| Electrical
|  
|  
| 15m
| 15m
|-
|-
| Install conveyor chain tensioner
| Install conveyor chain tensioner
| Mech
|  
|  
|  
|  
|-
|-
| Replace beater bar resetting breaker with 20A fuse
| Replace beater bar resetting breaker with 20A fuse
| Electrical
|  
|  
| <5m
| <5m
|-
|-
| Clean up wire from old flag sensors
| Clean up wire from old flag sensors
| Electrical
|  
|  
| 10m
| 10m
|-
|-
| Turret Encoder - make it work
| Turret Encoder - make it work  
| Elec/Mech/Prog
|  
|  
| 45m
| 45m
|-
|-
| Realign Wing Potentiometer
| Elec/Prog
|  
|  
| 15m
|-
| Phase B of Turrret to Side Car - Remove Drive Encoders
| Elec/Prog
|  
|  
|  
| 15m
|-
|-
| Initial Sensor Ring Out
| Elec/Mech/Prog
|  
|  
|  
| 30m
|
|-
|-
|  
|  
|
|
|-
|  
|  
|  
|  
|  
|  
|}
|}

Revision as of 21:52, 21 February 2012

This list is to track Robot/Controls activities that will be performed at FLR once the robot is uncrated and the pit crew can start working on the robot.

 

Task Team Priority Estimated Time
Mount and connect second turret sensor Electrical 15m
Install conveyor chain tensioner Mech
Replace beater bar resetting breaker with 20A fuse Electrical <5m
Clean up wire from old flag sensors Electrical 10m
Turret Encoder - make it work Elec/Mech/Prog 45m
Realign Wing Potentiometer Elec/Prog 15m
Phase B of Turrret to Side Car - Remove Drive Encoders Elec/Prog 15m
Initial Sensor Ring Out Elec/Mech/Prog 30m