This list is to track Robot/Controls activities that will be performed at FLR once the robot is uncrated and the pit crew can start working on the robot.

 

Task Team Priority Estimated Time
Mount and connect second turret sensor Electrical 2 15m
Install conveyor chain tensioner Mech 6 20m
Replace beater bar resetting breaker with 20A fuse Electrical 4 <5m
Clean up wire from old flag sensors Electrical 7 10m
Turret Encoder - make it work Elec/Mech/Prog 1 45m
Realign Wing Potentiometer Elec/Prog 5 15m
Phase B of Turrret to Side Car - Remove Drive Encoders Elec/Prog 3 15m
Initial Sensor Ring Out Elec/Mech/Prog 8 30m