2013:Electrical Controls 01.22: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
 
Line 28: Line 28:
= Materials Needed =
= Materials Needed =


*4 Caribeanners
*4 Caribiners
*Eric's expertises
*Eric's expertises
*
*

Latest revision as of 18:54, 23 January 2013

Attendance

Start time: 5:00 pm

End time: 9:00 pm

Members present: Ben S, Kyle Z, Shayna R, Gafie S

Members Attending Next Meeting: Ben S, Kyle Z

Tasks Completed

  • All part needed are recorded on the BOM

Tasks In Progress

  • Backpack design, need to prototype and draw out final design
  • choosing hinges for top panels
  • Putting final touches on CAD design for board

Tasks to Complete

  • Need to order parts
  • Prototype backpack design and set in stone
  • Find carrying hands for the sides
  • finish CAD design

Materials Needed

  • 4 Caribiners
  • Eric's expertises