2013:Climber 01.26: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 27: Line 27:
Release all fab parts 1/24/13
Release all fab parts 1/24/13


list all assembly hardware
list and order all assembly hardware


check 54 inch cyl
DONE-   check 54 inch cyl


Alex-   Design Black arm pivot
Alex-   Design Black arm pivot
Line 35: Line 35:
Alex-   Put in battery
Alex-   Put in battery


Design release mechanism for long arms and short arms
Design release mechanism for red arms and black arms


Design restraining mechanism for long arms and short arms
Design restraining mechanism for red arms and black arms


Brianna-   Add sensors to model
Brianna-   Add sensors to model
Line 52: Line 52:


Belay attachment points
Belay attachment points
Revise part #002 with "far side" note


ON HOLD - transmission chain tentioner
ON HOLD - transmission chain tentioner

Revision as of 10:39, 25 January 2013

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

Release all fab parts 1/24/13

list and order all assembly hardware

DONE-   check 54 inch cyl

Alex-   Design Black arm pivot

Alex-   Put in battery

Design release mechanism for red arms and black arms

Design restraining mechanism for red arms and black arms

Brianna-   Add sensors to model

Brianna-   Design the cross member with leg guide for Red arms and Black arms

Add lightening holes all over the place

Order all purchase parts

Combine all subteams parts and design the CG to be within +/- one inch from bot centerline

Use cross members to strengthen the elevator shafts

Belay attachment points

Revise part #002 with "far side" note

ON HOLD - transmission chain tentioner

 

 

Materials Needed

  • task
    • sub-task
    • sub-task
  • task