2010:Drivetrain: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(Added Master Task List)
(adding task)
Line 1: Line 1:
== Drivetrain Master Task List ==
== Drivetrain Master Task List ==


1. Complete Bill of Materials
1. Complete Bill of Materials  


2. Fix Rubbing Issue on Mock Drivetrain
2. Fix Rubbing Issue on Mock Drivetrain  


3. Make Bumpers
3. Make Bumpers  


4. Reassemble Drivetrain when parts return from Powdercoating
4. Reassemble Drivetrain when parts return from Powdercoating  
 
5. Design Mouse Sensor Mount


== Drivetrain Subteam's Engineering Notebook  ==
== Drivetrain Subteam's Engineering Notebook  ==

Revision as of 09:23, 21 January 2009

Drivetrain Master Task List

1. Complete Bill of Materials

2. Fix Rubbing Issue on Mock Drivetrain

3. Make Bumpers

4. Reassemble Drivetrain when parts return from Powdercoating

5. Design Mouse Sensor Mount

Drivetrain Subteam's Engineering Notebook

Week 1 - 42 Days Left!!

Drivetrain 1.6.2009

Drivetrain 1.7.2009

Drivetrain 1.8.2009

Drivetrain 1.10.2009

Drivetrain 1.11.2009

Week 2 - 35 Days Left!!

Drivetrain 1.13.2009

Drivetrain 1.14.2009

Drivetrain 1.15.2009

Drivetrain 1.17.2009

Drivetrain 1.18.2009

Week 3 - 28 Days Left!!

Drivetrain 1.20.2009

Drivetrain 1.21.2009

Drivetrain 1.22.2009

Drivetrain 1.24.2009

Drivetrain 1.25.2009



Please Label All Notebook Pages Drivetrain X.XX.2009 to avoid confusion.