2009:Electrical Main 2.5.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: 2.5.2009 Start time: 6:40pm End time: 9pm<br> Members present: Michael H, Sean K, Rika L, Crystal V, Apples, Oranges <br> ---- <br> <u>'''Burlone's Marching Orders of the Night:'''...)
 
No edit summary
Line 1: Line 1:
2.5.2009
2.5.2009  


Start time: 6:40pm
Start time: 6:40pm  


End time: 9pm<br>
End time: 9pm<br>  
 
Members present: Michael H, Sean K, Rika L, Crystal V, Apples, Oranges <br>


Members present: Michael H, Sean K, Rika L, Crystal V, Apples, Oranges <br>


<br>


----
----


<br>
<br>  


<u>'''Burlone's Marching Orders of the Night:'''</u>(¬O_o)¬
<u>'''Burlone's Marching Orders of the Night:'''</u>(¬O_o)¬  


1. Battery Box - Rika/Cuyler
1. Battery Box - Rika/Cuyler  


2. Remount Electrical (Saturday) -- Group
2. Remount Electrical (Saturday) -- Group  


3. Terminate / Leave one end long (6 AGW wires should be soldered) (i.e Speed controllers, cRIO)<br>
3. Terminate / Leave one end long (6 AGW wires should be soldered) (i.e Speed controllers, cRIO)<br>  


&nbsp;&nbsp;&nbsp; -PWM cabled will be used from kit, any other long lengths will be custom terminated.
&nbsp;&nbsp;&nbsp; -PWM cabled will be used from kit, any other long lengths will be custom terminated.  


'''Banner Sensor Configuration:'''
'''Banner Sensor Configuration:'''  


Put gother a wiring harness and use 7100's as an example - Sillyscope
Put together a wiring harness and use 7100's as an example - Sillyscope  


4. Continue velcroing the board -- Group
4. Continue velcroing the board -- Group  


5. Create Battery strap - Rika
5. Create Battery strap - Rika  


6. Mouse Encoders - Mike and Crystal
6. Mouse Encoders - Mike and Crystal  


7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean
7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean

Revision as of 16:06, 5 February 2009

2.5.2009

Start time: 6:40pm

End time: 9pm

Members present: Michael H, Sean K, Rika L, Crystal V, Apples, Oranges




Burlone's Marching Orders of the Night:(¬O_o)¬

1. Battery Box - Rika/Cuyler

2. Remount Electrical (Saturday) -- Group

3. Terminate / Leave one end long (6 AGW wires should be soldered) (i.e Speed controllers, cRIO)

    -PWM cabled will be used from kit, any other long lengths will be custom terminated.

Banner Sensor Configuration:

Put together a wiring harness and use 7100's as an example - Sillyscope

4. Continue velcroing the board -- Group

5. Create Battery strap - Rika

6. Mouse Encoders - Mike and Crystal

7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean