2009:Electrical Main 2.9.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page:  Start time: 6pm End time: 10pm (I have no idea -Crystal) Member's present: Crystal, Apples, Oranges Night's summary: We drilled holes into the frame and lexan and now have acces...)
 
No edit summary
Line 1: Line 1:
 Start time: 6pm
 Start time: 6pm  


End time: 10pm (I have no idea -Crystal)
End time: 9:30pm


Member's present: Crystal, Apples, Oranges
Member's present: Crystal, Apples, Oranges, Karen 


<br>


Night's summary:


Night's summary: We drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on.
*We drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on.&nbsp;&nbsp; Board is bolted on robot.
*Dave B. &amp; Jeff drilled some more holes for the battery box so it could be slid over to help balance the robot weight.
*we had some of the yummy cake Crystal brought.

Revision as of 09:07, 10 February 2009

 Start time: 6pm

End time: 9:30pm

Member's present: Crystal, Apples, Oranges, Karen 


Night's summary:

  • We drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on.   Board is bolted on robot.
  • Dave B. & Jeff drilled some more holes for the battery box so it could be slid over to help balance the robot weight.
  • we had some of the yummy cake Crystal brought.