Leadership (talk | contribs) |
Drivetrain (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
#<strike>Help Drivetrain with ProE Import</strike> | #<strike>Help Drivetrain with ProE Import</strike> | ||
#<strike>Have other teams review Trap Doors - Integration</strike> | #<strike>Have other teams review Trap Doors - Integration</strike> | ||
#Keep Track of Weight Distribution - Integration- Around 85 lbs minus cRIO, belting, bumpers and battery<br> | #Keep Track of Weight Distribution - Integration- Around 85 lbs minus cRIO, belting, bumpers and battery<br> | ||
#Complete Bill of Materials | #Complete Bill of Materials | ||
#Assign Surfaces for Control System Mounting | #Assign Surfaces for Control System Mounting | ||
Line 20: | Line 20: | ||
#Design seperator | #Design seperator | ||
<br> | |||
To do lists made on 2/16/09: Before ship, After Ship and at RIT are found in the log entry for 2/16/09 | |||
<br> | |||
= Resources = | = Resources = | ||
The 2009 Kit of Parts are designed in Autodesk Inventor Professional and available through the [https://firstbasefrc.autodesk.com/?nd=kitofparts Autodesk FIRSTbase website].<br> | The 2009 Kit of Parts are designed in Autodesk Inventor Professional and available through the [https://firstbasefrc.autodesk.com/?nd=kitofparts Autodesk FIRSTbase website].<br> | ||
= <u>'''<br>'''</u>This is the Mechanical Subteam 1's Engineering Notebook = | = <u>'''<br>'''</u>This is the Mechanical Subteam 1's Engineering Notebook = | ||
Line 90: | Line 94: | ||
[[Mechanical 2.8.2009|Mechanical 2.8.2009]] | [[Mechanical 2.8.2009|Mechanical 2.8.2009]] | ||
<span style="color: rgb(255, 0, 0);">'''Week 6 - 7 Days Left!!'''</span> | <span style="color: rgb(255, 0, 0);">'''Week 6 - 7 Days Left!!'''</span> | ||
[[Mechanical 2.9.2009|Mechanical 2.9.2009]] | [[Mechanical 2.9.2009|Mechanical 2.9.2009]] | ||
Line 98: | Line 102: | ||
[[Mechanical 2.11.2009|Mechanical 2.11.2009]] | [[Mechanical 2.11.2009|Mechanical 2.11.2009]] | ||
[[Mechanical 2.12.2009|Mechanical 2.12.2009]] | [[Mechanical 2.12.2009|Mechanical 2.12.2009]] | ||
[[Mechanical 2.13.2009|Mechanical 2.13.2009]] | [[Mechanical 2.13.2009|Mechanical 2.13.2009]] | ||
[[Mechanical 2.14.2009|Mechanical 2.14.2009]] | [[Mechanical 2.14.2009|Mechanical 2.14.2009]] | ||
[[Mechanical 2.15.2009|Mechanical 2.15.2009]] | [[Mechanical 2.15.2009|Mechanical 2.15.2009]] | ||
[[Mechanical 2.16.2009|Mechanical 2.16.2009]] | [[Mechanical 2.16.2009|Mechanical 2.16.2009]] | ||
[[Mechanical 2.17.2009|Mechanical 2.17.2009]] | [[Mechanical 2.17.2009|Mechanical 2.17.2009]] | ||
<br> | <br> |
Revision as of 18:40, 17 February 2009
Master Task List
Design Motor Mounts...DoneDesign Bearing Mounts ...DoneHelp Drivetrain with ProE ImportHave other teams review Trap Doors - Integration- Keep Track of Weight Distribution - Integration- Around 85 lbs minus cRIO, belting, bumpers and battery
- Complete Bill of Materials
- Assign Surfaces for Control System Mounting
Determine if front wheels are needed- Choose & Order Materials/Parts
Create Model Shop Drawings...Week 3 main focus- Add all belts & pulleys to design
Define Roller/Chicken Plucker designs ...DoneComplete Trap Door designs in Inventor ...DoneDefine outside material for robotDesign Sensor MountsDesign Battery Box & CRio Mount (Electrical needs help)...Finished by RikaMock up Weight on the Chassis so programming/Drivers can use ...Done- Design seperator
To do lists made on 2/16/09: Before ship, After Ship and at RIT are found in the log entry for 2/16/09
Resources
The 2009 Kit of Parts are designed in Autodesk Inventor Professional and available through the Autodesk FIRSTbase website.
This is the Mechanical Subteam 1's Engineering Notebook
Week 1 - 42 Days Left!!
Week 2 -35 Days Left!!
Week 3 - 28 Days Left!!
Week 4 - 21 Days Left!!
Week 5 - 14 Days Left!!
Week 6 - 7 Days Left!!
Please Label All Notebook Pages Mechanical 1 X.XX.2009 to avoid confusion.