== This is the Drivetrain Subteam's Engineering Notebook  ==
== This is the Drivetrain Subteam's Engineering Notebook  ==
 
= When posting new entries please make them "Drivetrain - Month.Day.Year" to avoid confusion with other pages!!! --Eric =
==  ==
==  ==


Line 15: Line 15:
Tony and Matt were show  drive wheel asembly.  
Tony and Matt were show  drive wheel asembly.  


ordered transmission
ordered transmission  


built up chassis frame
built up chassis frame  


<br>  
<br>  

Revision as of 19:15, 7 January 2009

This is the Drivetrain Subteam's Engineering Notebook

When posting new entries please make them "Drivetrain - Month.Day.Year" to avoid confusion with other pages!!! --Eric

1.07.2009

Start time: 6:00 pm

End time:  9:00 pm

Members present: Tony,  Goodman, Gannon, Larry, Dora

New bearings p/n r1212zz ordered.

Tony and Matt were show  drive wheel asembly.

ordered transmission

built up chassis frame


Tasks to complete: '

1.07.2009

Start time: 

End time:

Members present: Tony, Brenton, Goodman, Mark, Gannon, Larry


All, please use the files in your assembly.

I'll have to mail them *.stp is not allowed as to be uploaded by Wiki.


Tasks to complete:

1. Gather CAD files for inventor.
2. Assemble parts in inventor USE DATUMS
3. Make Drawings for custom parts
4. Make *.stp files for custom parts
5. Itemizes issues that need to be addressed
6. Become familiar with the design and Order of assembly
7. Figure out needed hardware. YOU ARE NOT LIMETED TO BOLTS AND NUTS



1. Gather CAD files for inventor.
2. Assemble parts in inventor USE DATUMS01.
3. Make Drawings for custom parts
4. Make *.stp files for custom parts
5. Itemizes issues that need to be addressed
6. Become familiar with the design and Order of assembly
7. Figure out needed hardware. YOU ARE NOT LIMETED TO BOLTS AND NUTS