At a Minimum EACH Engineering Notebook Entry should include the following:
'''1. Names of the people that attended&nbsp;''' Tresten.R&nbsp; Lizzy.M&nbsp; Matt.M Ben.S Graeme.B&nbsp; Josh.Gannon<br>


1. Names of the people that attended&nbsp; Tresten.R&nbsp; Lizzy.M&nbsp; Matt.M Ben.S Graeme.B&nbsp; Josh.Gannon<br>  
'''2. DATE &amp; Start &amp; Stop Time''' 6:40<br>  


2. DATE &amp; Start &amp; Stop Time 6:40<br>
'''3. Tasks accomplished'''
 
3. Tasks accomplished  


*Updated BOM  
*Updated BOM  
Line 14: Line 12:
#Bearing blocks  
#Bearing blocks  
#Cross brace  
#Cross brace  
#Wheels, traction, 8 inch (2)
#Wheels, traction, 8 inch (2)  
#Gearbox (12:1)
#Gearbox (12:1)  
#Hubs
#Hubs  
#Encoders
#Encoders


4. Tasks in process  
'''4. Tasks in process'''


*Drivetrain details
*Drivetrain details  
*Custom wheel design
*Custom wheel design


5. Tasks to complete tomorrow  
'''5. Tasks to complete tomorrow'''


*Order key stock (0.125 keyway)
*Order key stock (0.125 keyway)  
*Fasteners: determine BOM and order
*Fasteners: determine BOM and order


6. Names of people attending tomorrow Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S<br>
'''6. Names of people attending tomorrow :'''Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S


7. Materials are needed to work  
'''7. Materials are needed to work'''


*Build bumpers
*Build bumpers  
*Assemble motor/mount/encoder/gearbox  
*Assemble motor/mount/encoder/gearbox  
*Install bearings and bearing blocks
*Install bearings and bearing blocks  
*Design bumper mounts
*Design bumper mounts  
*Design wheel protectors
*Design wheel protectors  
*Investigate more elegant motor/transmission/gearbox/bearing block/encoder mount
*Investigate more elegant motor/transmission/gearbox/bearing block/encoder mount


<br>
<br>  


<br><br>
<br><br>

Revision as of 16:31, 13 January 2010

1. Names of the people that attended  Tresten.R  Lizzy.M  Matt.M Ben.S Graeme.B  Josh.Gannon

2. DATE & Start & Stop Time 6:40

3. Tasks accomplished

  • Updated BOM
  • Parts ordered:
  1. Motor mounts
  2. Chassis brackets
  3. Bearing blocks
  4. Cross brace
  5. Wheels, traction, 8 inch (2)
  6. Gearbox (12:1)
  7. Hubs
  8. Encoders

4. Tasks in process

  • Drivetrain details
  • Custom wheel design

5. Tasks to complete tomorrow

  • Order key stock (0.125 keyway)
  • Fasteners: determine BOM and order

6. Names of people attending tomorrow :Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S

7. Materials are needed to work

  • Build bumpers
  • Assemble motor/mount/encoder/gearbox
  • Install bearings and bearing blocks
  • Design bumper mounts
  • Design wheel protectors
  • Investigate more elegant motor/transmission/gearbox/bearing block/encoder mount