2010:Mechanical 2 01.13: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Mechanical1 (talk | contribs) No edit summary |
Mechanical1 (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
Members: Mike M., Jake K, Chris H, Alex V, Alex W, Shauna R, Becca H | Members: Mike M., Jake K, Chris H, Alex V, Alex W, Shauna R, Becca H | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> | ||
*We continued the design of the shooting mechanism | *We continued the design of the shooting mechanism | ||
Line 20: | Line 20: | ||
*Tomorrow we need to finish concepts and start real design and possible prototyping | *Tomorrow we need to finish concepts and start real design and possible prototyping | ||
[[Image:1-13-10_kicker_ready_to_kick.jpg]]The sketch of the kicker mechanism ready to kick. | |||
[[Image:1-13-10_kicker_kicked.jpg]]The kicker in the post-kick position (the ball is not) | |||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
. | . |
Revision as of 17:40, 14 January 2010
1/13/10
Started at 6:30 and ended at 9:00
Members: Mike M., Jake K, Chris H, Alex V, Alex W, Shauna R, Becca H
- We continued the design of the shooting mechanism
- Review concept of hanging mechanism
- Started planning for prototyping
- Reviewed the game and game animation several times
- Went over Dave's mechanical shooting mechanism drawing
- Started review and refining materials needed including steel and aluminum tubing, wood; plywood, 2x4's
- Discussed concepts with Larry
- Tomorrow we need to finish concepts and start real design and possible prototyping
The sketch of the kicker mechanism ready to kick.
The kicker in the post-kick position (the ball is not)
.