2010:Electrical Main 01.24: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
Line 11: Line 11:
'''Tasks Completed:'''<br>
'''Tasks Completed:'''<br>


*checked the pneumatics breakout "bumper" documentation and verified that we only need to supply&nbsp;it with +12V from the circuit breaker panel.&nbsp; It&nbsp;has its own onboard voltage regulator to generate the +24V that the pneumatics require (Dave S)&nbsp;
*checked the pneumatics breakout "bumper" board&nbsp;documentation and verified that we only need to supply&nbsp;it with +12V from the circuit breaker panel.&nbsp; It&nbsp;has its own onboard voltage regulator to generate the +24V that the pneumatics require (Dave S)&nbsp;  
*task
*task



Latest revision as of 12:26, 24 January 2010

1.24.2010

Start time: 10:00

End time:

Members present: Michael Hartman, Vaughn Thompson, Dave B.


Tasks Completed:

  • checked the pneumatics breakout "bumper" board documentation and verified that we only need to supply it with +12V from the circuit breaker panel.  It has its own onboard voltage regulator to generate the +24V that the pneumatics require (Dave S) 
  • task




Tasks to Complete:

  • BOM
  • Shopping List



Materials Needed:

  • item
  • item

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)


Jaguar- http://ordering.digikey.com/Promotions/FirstRoboticsCompetition.aspx

Victor - http://www.vexrobotics.com/products/vexpro/victor-speed-controller.html