2010:Controls 01.26: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: = Attendance: = Crystal, Averill, Karen = Tasks: = *Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP. *Switch the...)
 
No edit summary
Line 5: Line 5:




= Tasks: =
= Tasks: =


*Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP.
*Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP.  
*Switch the joystick screws to plack screws
*Switch the joystick screws to plack screws

Revision as of 17:10, 26 January 2010

Attendance:

Crystal, Averill, Karen


Tasks:

  • Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP.
  • Switch the joystick screws to plack screws