2009:Integration 1.15.2009: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Mechanical1 (talk | contribs) (New page: <u>'''Integration Meeting Notes – 1/15/09'''</u> <br> <u>Mechanical 2:</u><br>Working on Frame Design <br><u>Programming:</u><br>May want a traction wheel to measure start/stop distan...) |
m (Integration 1.15.2009 moved to 2009:Integration 1.15.2009) |
(No difference)
|
Latest revision as of 13:38, 14 November 2010
Integration Meeting Notes – 1/15/09
Mechanical 2:
Working on Frame Design
Programming:
May want a traction wheel to measure start/stop distance
Needs
Assembly of ball manipulation in Inventor – Mech 2 Needs from Mech 1
Space for electrical – still needs to be done – DUE TONIGHT
Available space & Dimensions needed from Inventor Mock Up – Not done Need Sunday
What Sensors are Needed – incomplete, in progress, DUE 18th
Need overall design of ball manipulator to determine sensors –
Trap Doors Defined – DUE 18th
Need Control Box I/O – Not done (next week ok 21stish)
Programming to determine if encoder wheel needed – Due Sat
Drivetrain needs help porting ProE into Inventor – Due