2011:FieldMasterTaskList: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 31: Line 31:
*Design New Pit Set-up
*Design New Pit Set-up
*Repair the damaged areas of the crate
*Repair the damaged areas of the crate
*Set-up the cart for the 2011 robot

Revision as of 09:06, 17 January 2011

2011 Game Elements

  • Finish cutting PVC
  • Glue remaining PVC sections together
  • Attach retention plates to PVC outriggers
  • Finish cutting tower base supports
  • Assemble 3 remaining tower bases
  • Paint lane dividers and tower bases
  • Cut out the hole in the 1 remaining floor protector
  • Order game pieces
    • 13 Red Triangle
    • 13 Blue Square
    • 13 White Circle
    • 7 Yellow Ubertube
  • Cut Scrap Pieces of carpet to cover the floor protectors

Alliance Station Walls

  • Cut 2x4's to proper length
    • Wall Uprights
    • Wall Cross Members
    • Player Station Legs
    • Player Station Frames
  • Cut plywood player station tops
  • Cut plywood corner brackets
  • Paint alliance station wall bottoms
  • Assemble the sections of the new alliance station walls

Other Items

  • Design New Pit Set-up
  • Repair the damaged areas of the crate
  • Set-up the cart for the 2011 robot