2011:FieldMasterTaskList: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Leadership (talk | contribs) No edit summary |
Leadership (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
= 2011 Game Elements = | == 2011 Game Elements == | ||
*Finish cutting PVC | *<strike>Finish cutting PVC<\strike> | ||
*Glue remaining PVC sections together | *Glue remaining PVC sections together | ||
*Attach retention plates to PVC outriggers | *Attach retention plates to PVC outriggers | ||
*Finish cutting tower base supports | *Finish cutting tower base supports | ||
*Assemble 3 remaining tower bases | *Assemble 3 remaining tower bases | ||
*Cut out the hole in the 1 remaining floor protector | *Cut out the hole in the 1 remaining floor protector | ||
*Order game pieces | *Order game pieces | ||
** | **14 Red Triangle | ||
** | **14 Blue Square | ||
** | **14 White Circle | ||
** | **8 Yellow Ubertube | ||
*Cut Scrap Pieces of carpet to cover the floor protectors | *Cut Scrap Pieces of carpet to cover the floor protectors | ||
*Cut plywood pieces for the feeder slots in alliance walls | *Cut plywood pieces for the feeder slots in alliance walls | ||
= Alliance Station Walls = | |||
== Alliance Station Walls == | |||
*Cut 2x4's to proper length | *Cut 2x4's to proper length | ||
Line 27: | Line 25: | ||
*Cut plywood player station tops | *Cut plywood player station tops | ||
*Cut plywood corner brackets | *Cut plywood corner brackets | ||
*Assemble the sections of the new alliance station walls | |||
== Painting == | |||
*Paint alliance station wall bottoms | *Paint alliance station wall bottoms | ||
*Paint alliance station wall frames | *Paint alliance station wall frames | ||
* | *Paint tower bases | ||
*Paint lane dividers | |||
= Other Items = | == Other Items == | ||
*Design New Pit Set-up | *Design New Pit Set-up | ||
Line 37: | Line 40: | ||
*Set-up the cart for the 2011 robot | *Set-up the cart for the 2011 robot | ||
*Clean up scrap materials in the new closet | *Clean up scrap materials in the new closet | ||
*Organize the new closet | |||
*Look into new ways to build field rails for Rally | *Look into new ways to build field rails for Rally |
Revision as of 20:04, 19 January 2011
2011 Game Elements
Finish cutting PVC<\strike>- Glue remaining PVC sections together
- Attach retention plates to PVC outriggers
- Finish cutting tower base supports
- Assemble 3 remaining tower bases
- Cut out the hole in the 1 remaining floor protector
- Order game pieces
- 14 Red Triangle
- 14 Blue Square
- 14 White Circle
- 8 Yellow Ubertube
- Cut Scrap Pieces of carpet to cover the floor protectors
- Cut plywood pieces for the feeder slots in alliance walls
Alliance Station Walls
- Cut 2x4's to proper length
- Wall Uprights
- Wall Cross Members
- Player Station Legs
- Player Station Frames
- Cut plywood player station tops
- Cut plywood corner brackets
- Assemble the sections of the new alliance station walls
Painting
- Paint alliance station wall bottoms
- Paint alliance station wall frames
- Paint tower bases
- Paint lane dividers
Other Items
- Design New Pit Set-up
- Repair the damaged areas of the crate
- Set-up the cart for the 2011 robot
- Clean up scrap materials in the new closet
- Organize the new closet
- Look into new ways to build field rails for Rally