2011:FieldMasterTaskList: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
== 2011 Game Elements ==
== 2011 Game Elements ==


*<strike>Finish cutting PVC<\strike>
*<strike>Finish cutting PVC</strike>
*Glue remaining PVC sections together
*Glue remaining PVC sections together
*Attach retention plates to PVC outriggers
*Attach retention plates to PVC outriggers

Revision as of 20:04, 19 January 2011

2011 Game Elements

  • Finish cutting PVC
  • Glue remaining PVC sections together
  • Attach retention plates to PVC outriggers
  • Finish cutting tower base supports
  • Assemble 3 remaining tower bases
  • Cut out the hole in the 1 remaining floor protector
  • Order game pieces
    • 14 Red Triangle
    • 14 Blue Square
    • 14 White Circle
    • 8 Yellow Ubertube
  • Cut Scrap Pieces of carpet to cover the floor protectors
  • Cut plywood pieces for the feeder slots in alliance walls


Alliance Station Walls

  • Cut 2x4's to proper length
    • Wall Uprights
    • Wall Cross Members
    • Player Station Legs
    • Player Station Frames
  • Cut plywood player station tops
  • Cut plywood corner brackets
  • Assemble the sections of the new alliance station walls

Painting

  • Paint alliance station wall bottoms
  • Paint alliance station wall frames
  • Paint tower bases
  • Paint lane dividers

Other Items

  • Design New Pit Set-up
  • Repair the damaged areas of the crate
  • Set-up the cart for the 2011 robot
  • Clean up scrap materials in the new closet
  • Organize the new closet
  • Look into new ways to build field rails for Rally