2011:Drivetrain 1.23: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Mechanical2 (talk | contribs) No edit summary |
Drivetrain (talk | contribs) (added bumper fabric order info.) |
||
Line 5: | Line 5: | ||
'''End time:''' | '''End time:''' | ||
'''Members present:''' Mo, Matt | '''Members present:''' Mo, Matt | ||
'''Members Attending Next Meeting:''' | '''Members Attending Next Meeting:''' | ||
Line 11: | Line 11: | ||
= Tasks Completed = | = Tasks Completed = | ||
*complete :Assemble 4 omni wheels and hubs and sprockets <br>Check to make sure we have epoxy or Gorilla glue. <br> | *complete :Assemble 4 omni wheels and hubs and sprockets <br>Check to make sure we have epoxy or Gorilla glue. <br><br> | ||
* | *Fabric ordered by Cynette for bumpers - 2 yards each red and blue. Ordered from Old Trail Fabric Outlet. (oldtrailfabric.com) <br> | ||
= Tasks to Complete = | = Tasks to Complete = | ||
*Assemble traction wheels with hubs and sprockets <br> | *Assemble traction wheels with hubs and sprockets <br> | ||
*For traction wheels, method is rivet one end first, do trial fit, stretch, roll around, a couple of times. Get length cut. <br>glue, and wrap tread, drill the two remaining rivet holes. Make sure tread is seated all around. <br>Determine where to mount bumpers either through frame rail channels or make brackets? <br>Need to buy bolts for bumpers, if we go through frame rail it will be 3/8" -16 x 2.5Tasks In Progress <br>sub-task | *For traction wheels, method is rivet one end first, do trial fit, stretch, roll around, a couple of times. Get length cut. <br>glue, and wrap tread, drill the two remaining rivet holes. Make sure tread is seated all around. <br>Determine where to mount bumpers either through frame rail channels or make brackets? <br>Need to buy bolts for bumpers, if we go through frame rail it will be 3/8" -16 x 2.5Tasks In Progress <br>sub-task | ||
* | *Make final decision on bumpers: One set of red, blue cover ok with everyone? | ||
*Build bumpers when fabric comes in. | |||
= Materials Needed = | = Materials Needed = | ||
Line 26: | Line 25: | ||
*task | *task | ||
**sub-task | **sub-task | ||
**sub-task | **sub-task | ||
*task | *task |
Revision as of 14:10, 23 January 2011
Attendance
Start time:
End time:
Members present: Mo, Matt
Members Attending Next Meeting:
Tasks Completed
- complete :Assemble 4 omni wheels and hubs and sprockets
Check to make sure we have epoxy or Gorilla glue. - Fabric ordered by Cynette for bumpers - 2 yards each red and blue. Ordered from Old Trail Fabric Outlet. (oldtrailfabric.com)
Tasks to Complete
- Assemble traction wheels with hubs and sprockets
- For traction wheels, method is rivet one end first, do trial fit, stretch, roll around, a couple of times. Get length cut.
glue, and wrap tread, drill the two remaining rivet holes. Make sure tread is seated all around.
Determine where to mount bumpers either through frame rail channels or make brackets?
Need to buy bolts for bumpers, if we go through frame rail it will be 3/8" -16 x 2.5Tasks In Progress
sub-task - Make final decision on bumpers: One set of red, blue cover ok with everyone?
- Build bumpers when fabric comes in.
Materials Needed
- task
- sub-task
- sub-task
- task