**Tasks to Complete | **Tasks to Complete | ||
*4 Deployer park side side shield A<br> * 5 Deployer park side side shield B<br> * 6 Drawbridge<br> * 7 Side board supports, Done<br> * 8 Belly pan<br> | *4 Deployer park side side shield A<br> * 5 Deployer park side side shield B<br> * 6 Drawbridge<br> * 7 Side board supports, Done<br> * 8 Belly pan<br> | ||
*sensor brackets and flags 3 | *sensor brackets and flags 3 | ||
*arm release trigger | *arm release trigger | ||
*parts inventory | *parts inventory | ||
** | **encoder on the jack shaft | ||
**jack shaft details | |||
= Materials Needed = | = Materials Needed = |
Revision as of 09:43, 5 February 2011
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- task
- sub-task
- sub-task
- task
Tasks In Progress
- task
- sub-task
- sub-task
- task
Tasks to Complete
o Larry asks;
* 1 Do we have a sprocket guard figured out yet for the top of the arm?
---Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
* 2 The Minibot deployer is outside the boarder of the superstructure that supports the arm and holds the deployer.
---Mechanical 2 is working on a protective barrior.
* 3 How are we going to protect the Minibot from getting hit or accidentally getting knocked off the deployer?
- 4 We need to finalize the release mechanism for the deployer.
- 5 We don’t have a final design for the tusks or how they will be deployed yet.
- 6 From the top of the deployer plate if I drew a line 12 inches up would we be above the deployment line on the tower pole? If so this would prohibit us from being to use other Minibots that are taller than ours.
- 7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots?
- Tasks to Complete
- 4 Deployer park side side shield A
* 5 Deployer park side side shield B
* 6 Drawbridge
* 7 Side board supports, Done
* 8 Belly pan - sensor brackets and flags 3
- arm release trigger
- parts inventory
- encoder on the jack shaft
- jack shaft details
Materials Needed
- task
- sub-task
- sub-task
- task