2011:Mechanical 2 2.6: Difference between revisions
Mechanical2 (talk | contribs) No edit summary |
Mechanical2 (talk | contribs) No edit summary |
||
Line 18: | Line 18: | ||
= Tasks In Progress = | = Tasks In Progress = | ||
- Do we have a sprocket guard figured out yet for the top of the arm?<br>- Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.<br>5- We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!! | - Do we have a sprocket guard figured out yet for the top of the arm?<br>- Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.<br>5- We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!<br> | ||
- | '''- Deployer park side side shield A ALEX needs drawing<br>- Deployer park side side shield B ALEX needs drawing'''<br> - Drawbridge TOM / Alex<br> | ||
Dust pan deploy<br>- Side electrical board supports, and place board CIANNA<br>- Belly pan | |||
'''1- sensor brackets and flags 3''' | '''1- sensor brackets and flags 3 Brianna''' | ||
- arm release trigger | - arm release trigger | ||
Line 32: | Line 32: | ||
2- jack shaft details | 2- jack shaft details | ||
encoder on the jack shaft | encoder on the jack shaft | ||
- ASSEMBLE | - ASSEMBLE | ||
Line 40: | Line 40: | ||
3- MINI BOT HOLDER | 3- MINI BOT HOLDER | ||
'''4- Light tower mount.''' | '''4- Light tower mount. Gabe''' | ||
'''- Deploy side deployer mount sheet metal'''<br> | '''- Deploy side deployer mount sheet metal'''<br> | ||
'''- dust pan''' | '''- dust pan''' | ||
<br> | <br> |
Revision as of 10:29, 6 February 2011
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- task
- sub-task
- sub-task
- task
Tasks In Progress
- Do we have a sprocket guard figured out yet for the top of the arm?
- Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
5- We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!
- Deployer park side side shield A ALEX needs drawing
- Deployer park side side shield B ALEX needs drawing
- Drawbridge TOM / Alex
Dust pan deploy
- Side electrical board supports, and place board CIANNA
- Belly pan
1- sensor brackets and flags 3 Brianna
- arm release trigger
- parts inventory
2- jack shaft details
encoder on the jack shaft
- ASSEMBLE
- put in electrical components and weight cg work.CIANNA
3- MINI BOT HOLDER
4- Light tower mount. Gabe
- Deploy side deployer mount sheet metal
- dust pan
Tasks to Complete
- task
- sub-task
- sub-task
- task
Materials Needed
- task
- sub-task
- sub-task
- task