2011:Mechanical 2 2.6: Difference between revisions
Mechanical2 (talk | contribs) No edit summary |
Mechanical2 (talk | contribs) No edit summary |
||
Line 18: | Line 18: | ||
= Tasks In Progress = | = Tasks In Progress = | ||
- Do we have a sprocket guard figured out yet for the top of the arm?<br> | - Do we have a sprocket guard figured out yet for the top of the arm?<br> Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.<br> | ||
'''- Deployer park side side shield A ALEX needs drawing<br>- Deployer park side side shield B ALEX needs drawing'''<br> - Drawbridge TOM / Alex<br> | '''- Deployer park side side shield A ALEX needs drawing<br>- Deployer park side side shield B ALEX needs drawing'''<br> - Drawbridge TOM / Alex<br> |
Revision as of 10:31, 6 February 2011
Attendance
Start time:
End time:
Members present:Brianna, Ciana, Alex, Mr Kanzler, Mr Wolf
Members Attending Next Meeting:
Tasks Completed
- task
- sub-task
- sub-task
- task
Tasks In Progress
- Do we have a sprocket guard figured out yet for the top of the arm?
Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
- Deployer park side side shield A ALEX needs drawing
- Deployer park side side shield B ALEX needs drawing
- Drawbridge TOM / Alex
Dust pan deploy
- Side electrical board supports, and place board CIANNA
- Belly pan
1- sensor brackets and flags 3 Brianna
- arm release trigger
- parts inventory
2- jack shaft details
encoder on the jack shaft
- ASSEMBLE
- put in electrical components and weight cg work.CIANNA
3- MINI BOT HOLDER
4- Light tower mount. Gabe
- Deploy side deployer mount sheet metal
- dust pan
Tasks to Complete
- task
- sub-task
- sub-task
- task
Materials Needed
- task
- sub-task
- sub-task
- task