2011:Mechanical 2 2.8: Difference between revisions
Mechanical2 (talk | contribs) No edit summary |
Mechanical2 (talk | contribs) No edit summary |
||
Line 11: | Line 11: | ||
= Tasks Completed = | = Tasks Completed = | ||
- Do we have a sprocket guard figured out yet for the top of the arm?<br> Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make. | - Do we have a sprocket guard figured out yet for the top of the arm?<br> Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make. | ||
- Deployer, arm park side side, shield and support ALEX need 4 drawings<br> - Draw bridge TOM / Alex | - Deployer, arm park side side, shield and support ALEX need 4 drawings<br> - Draw bridge TOM / Alex | ||
Draw bridge deploy<br> - Side electrical board supports, and place board CIANNA<br> - Belly pan | Draw bridge deploy<br> - Side electrical board supports, and place board CIANNA<br> - Belly pan | ||
1- sensor brackets and flags 3 Brianna | 1- sensor brackets and flags 3 Brianna | ||
- arm release trigger | - arm release trigger | ||
- parts inventory | - parts inventory | ||
2- jack shaft details | 2- jack shaft details | ||
encoder on the jack shaft | encoder on the jack shaft | ||
- ASSEMBLE | - ASSEMBLE | ||
- put in electrical components and weight cg work.CIANNA | - put in electrical components and weight cg work.CIANNA | ||
3- MINI BOT HOLDER | 3- MINI BOT HOLDER | ||
4- Light tower mount. Gabe | 4- Light tower mount. Gabe | ||
- Deploy side deployer mount, sheet metal | - Deploy side deployer mount, sheet metal | ||
- Redesign Arm shoulder support stiffener rear | |||
= Tasks In Progress = | = Tasks In Progress = |
Revision as of 17:38, 8 February 2011
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- Do we have a sprocket guard figured out yet for the top of the arm?
Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
- Deployer, arm park side side, shield and support ALEX need 4 drawings
- Draw bridge TOM / Alex
Draw bridge deploy
- Side electrical board supports, and place board CIANNA
- Belly pan
1- sensor brackets and flags 3 Brianna
- arm release trigger
- parts inventory
2- jack shaft details
encoder on the jack shaft
- ASSEMBLE
- put in electrical components and weight cg work.CIANNA
3- MINI BOT HOLDER
4- Light tower mount. Gabe
- Deploy side deployer mount, sheet metal
- Redesign Arm shoulder support stiffener rear
Tasks In Progress
- task
- sub-task
- sub-task
- task
Tasks to Complete
- task
- sub-task
- sub-task
- task
Materials Needed
- task
- sub-task
- sub-task
- task