2011:Electrical Main 2.13: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
Line 11: Line 11:
= Tasks Completed  =
= Tasks Completed  =


*roughed in wires for arm
*roughed in wires for arm  
*attached side board mounts to the tower superstructure
*attached side board mounts to the tower superstructure  
*mounted 3 extra LED's on mosfet control board to give local display of line sensors (ultimately these must connect to black wires from the line sensors)


= Tasks In Progress =  
= Tasks In Progress =  

Latest revision as of 10:35, 14 February 2011

Attendance

Start time:

End time:

Members present:  Ciana, Vaughn, Dave B., Dave S.,

Members Attending Next Meeting:

Tasks Completed

  • roughed in wires for arm
  • attached side board mounts to the tower superstructure
  • mounted 3 extra LED's on mosfet control board to give local display of line sensors (ultimately these must connect to black wires from the line sensors)

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

  • task
    • sub-task
    • sub-task
  • task

Materials Needed

  • task
    • sub-task
    • sub-task
  • task