No edit summary
 
Line 31: Line 31:
In-process (Alex W)<br>* Deburr Arm Holes  
In-process (Alex W)<br>* Deburr Arm Holes  


Completed (Lizzy)<br>* Drill and Tap AndyMark Hub for Arm<br>Drawing Required<br>* Assemble AndyMark Hub to Arm <br>
Completed (Lizzy)<br>* Drill and Tap AndyMark Hub for Arm<br>Drawing Required<br>* Assemble AndyMark Hub to Arm <br>  


- arm release trigger.  
- arm release trigger.  
Line 55: Line 55:
- NEED TO MAKE PARTS AT SCHOOL, Draw bridge deploy  
- NEED TO MAKE PARTS AT SCHOOL, Draw bridge deploy  


- NEED TO MAKE PARTS AT SCHOOL, MINI BOT HOLDER
- NEED TO MAKE PARTS AT SCHOOL, MINI BOT HOLDER  
 
- NEED TO MAKE PARTS AT SCHOOL, Light tower mount.


- NEED TO MAKE PARTS AT SCHOOL, Light tower mount.  
- NEED TO MAKE PARTS AT SCHOOL, Light tower mount.  
Line 64: Line 62:


- NEED TO MAKE PARTS AT SCHOOL, Arm Park side deployer mount.  
- NEED TO MAKE PARTS AT SCHOOL, Arm Park side deployer mount.  
- NEED to design and fabricate an adaptor for the manipulator wrist.


- Do we have a sprocket guard figured out yet for the top of the arm?<br>(Safty in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.)  
- Do we have a sprocket guard figured out yet for the top of the arm?<br>(Safty in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.)  
Line 73: Line 69:
- put in electrical components and weight cg work.  
- put in electrical components and weight cg work.  


xxxxxxxxxxxxxxxxxxxxxx<br>
xxxxxxxxxxxxxxxxxxxxxx<br>  


<br>


<br><br>


<br><br>
<br>  


<br>
<br>  


<br>
<br>  
 
<br>


<br>Materials Needed  
<br>Materials Needed  
Line 89: Line 85:
*task  
*task  
**sub-task  
**sub-task  
**sub-task
**sub-task  
*task
*task

Latest revision as of 18:00, 14 February 2011

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

Arm Shaft Machining

Drawing completed (Alex W) <span id="fck_dom_range_temp_1297715372402_477" />

  • Fabricate Arm/Sprocket Mounting Angles
  • Arm Hinge Shaft machining

Drawings complete (TDK)

  • Buy or find E-Rings *
  • Layout and Drill Arm Extensions

Partially complete (Jonathan, Manuel)
* Assemble Latches and Springs
Partially complete (Manuel)

  • Machine chamfer into Big Sprocket (Tony D)IN-PROCESS
    * Mill Arm Slots

In-process (Alex W)
* Deburr Arm Holes

Completed (Lizzy)
* Drill and Tap AndyMark Hub for Arm
Drawing Required
* Assemble AndyMark Hub to Arm

- arm release trigger.

- NEED TO MAKE PARTS AT SCHOOL, Side electrical board supports.

- NEED TO MAKE PARTS AT SCHOOL, Belly pan stiffeners and side covers.

- NEED TO MAKE PARTS AT SCHOOL, sensor brackets and flags 3

- NEED TO MAKE PARTS AT SCHOOL, jack shaft details

(encoder on the jack shaft)

- NEED TO MAKE PARTS AT SCHOOL, Detail and build legs and plugs.

- NEED TO MAKE PARTS AT SCHOOL?????, Redesign Arm shoulder support stiffener rear. Drawing sent to Harris.


Tasks In Progress

Find or make plastic spacers
* Buy #8 button head screws *
* Bore lightening holes in 66T sprocket ON HOLD
Need drawing

- NEED TO MAKE PARTS AT SCHOOL, Draw bridge deploy

- NEED TO MAKE PARTS AT SCHOOL, MINI BOT HOLDER

- NEED TO MAKE PARTS AT SCHOOL, Light tower mount.

- NEED TO MAKE PARTS AT SCHOOL, Deploy side deployer mount.

- NEED TO MAKE PARTS AT SCHOOL, Arm Park side deployer mount.

- Do we have a sprocket guard figured out yet for the top of the arm?
(Safty in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.)

- Assemble manipulator

- put in electrical components and weight cg work.

xxxxxxxxxxxxxxxxxxxxxx








Materials Needed

  • task
    • sub-task
    • sub-task
  • task