2011:Mechanical 2 2.22: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
= Attendance  =
= Attendance  =


'''Start time:'''
'''Start time:'''  


'''End time:'''
'''End time:'''  


'''Members present:'''
'''Members present:'''  


'''Members Attending Next Meeting:'''
'''Members Attending Next Meeting:'''  
 
= Tasks Completed  =
 
*task
**sub-task
**sub-task
*task
 
= Tasks In Progress  =
 
*task
**sub-task
**
sub-task
 
 
 
*task


= Tasks to Complete  =
= Tasks to Complete  =


At FLR
At FLR  


1 Put bolts in the corners of the upper structure
1 Put bolts in the corners of the upper structure  


2 Put on chain guard
2 Put on chain guard  


3 Put on minibot roof
3 Put on minibot roof  


Before FLR
Before FLR  


1 Order McmasterCarr parts
1 Order McmasterCarr parts  


2 Order spare parts from Harris
2 Order spare parts from Harris  


3 Redesign manupulator wheel shafts for maintainability
3 Redesign manipulator wheel shafts for maintainability  


4 Design chain guard
4 Design chain guard  


5 Design manipulator wheel guard 
5 Design manipulator wheel guard   


6 Design minibot roof and backstop
6 Design minibot roof and backstop  


= Materials Needed  =
= Materials Needed  =

Revision as of 12:27, 22 February 2011

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks to Complete

At FLR

1 Put bolts in the corners of the upper structure

2 Put on chain guard

3 Put on minibot roof

Before FLR

1 Order McmasterCarr parts

2 Order spare parts from Harris

3 Redesign manipulator wheel shafts for maintainability

4 Design chain guard

5 Design manipulator wheel guard 

6 Design minibot roof and backstop

Materials Needed

  • task
    • sub-task
    • sub-task
  • task