2009:Electrical 1.15.09: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 12: | Line 12: | ||
*Tested bright light interferance with Omron Sensors.<br> | *Tested bright light interferance with Omron Sensors.<br> | ||
* | *Determined that hopefully two omrons will go on both ends of the converyors | ||
* | |||
<br> | <br> | ||
Line 27: | Line 28: | ||
---- | ---- | ||
'''Tasks to Complete: '''<br> | '''Tasks to Complete/Things we want to know: '''<br> | ||
* | *Do we want six photoelectric sensors<br> | ||
*task | *task | ||
Revision as of 17:39, 15 January 2009
01.15.2009
Start time: 7
End time: 9
Members present: Rika, Crystal, Sean, Michael, Josh, Oranges, Apples
Tasks Completed:
- Tested bright light interferance with Omron Sensors.
- Determined that hopefully two omrons will go on both ends of the converyors
Tasks In Progress:
- task
- task
Tasks to Complete/Things we want to know:
- Do we want six photoelectric sensors
- task
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)