2013:Climber 01.26: Difference between revisions
Mechanical1 (talk | contribs) No edit summary |
Mechanical1 (talk | contribs) |
||
Line 31: | Line 31: | ||
DONE- check 54 inch cyl | DONE- check 54 inch cyl | ||
Alex- Design Black arm pivot | DONE Alex- Design Black arm pivot | ||
Alex- Put in battery | DONE Alex- Put in battery | ||
Design release mechanism for red arms and black arms | Design release mechanism for red arms and black arms |
Revision as of 11:57, 27 January 2013
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- task
- sub-task
- sub-task
- task
Tasks In Progress
- task
- sub-task
- sub-task
- task
Tasks to Complete
Release all fab parts 1/24/13
list and order all assembly hardware
DONE- check 54 inch cyl
DONE Alex- Design Black arm pivot
DONE Alex- Put in battery
Design release mechanism for red arms and black arms
Design restraining mechanism for red arms and black arms
Brianna- Add sensors to model
Brianna- Design the cross member with leg guide for Red arms and Black arms
Add lightening holes all over the place
Order all purchase parts
Combine all subteams parts and design the CG to be within +/- one inch from bot centerline
Use cross members to strengthen the elevator shafts
Belay attachment points
Revise part #002 with "far side" note
Redesign 002 elevator C chanel to accomodate "new" pyramid.
Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.
ON HOLD - transmission chain tentioner
Materials Needed
- task
- sub-task
- sub-task
- task