2014:Integration: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(Created page with "= To Do = #Finish primary chassis ##Paint ##Instal Wheels ##Instal transmitions ##Add chains ##Add Circuit Plank ##Wire It up ##Add code  ##Mock up drive station #Finish CA...")
 
No edit summary
Line 1: Line 1:
= To Do =
= To Do =


#Finish primary chassis
#
##Paint
##Instal Wheels
##Instal transmitions
##Add chains
##Add Circuit Plank
##Wire It up
##Add code 
##Mock up drive station
#Finish CAD model
#Finish Secondary chassis
##Finish L brackets
##Assemble
##Add Wheels
##Add Transmitions
##Add chains
##Add<font size="3">&nbsp;</font><span style="font-size: small;">Circuit Plank</span>
##Wire It up
##Download Code
##Fake Driver Station
 
 


= Goals =
= Goals =


*Make substantial progress on the CAD model(s) of the robot (by Tuesday 1/13 integration meeting at 6:30)
*
*Assemble the second chassis (by Tuesday 1/13 integration meeting at 6:30)
*Prepare primary chassis
*Build transmissions
*Finish primary drivetrain
*Finish secondary drivetrain


== Completed Goals ==
== Completed Goals ==


*'''NONE'''
*
 
= Drivetrain Design Specifications =
 
*27" long * 28" wide aluminum c-channel chassis


== Ideas For Changes ==
= Design Specifications =


*'''NONE'''
*


= Equipment Requirements/Size =
= Equipment Requirements/Size =


*-Weight
*
**
Unknown
 
*-Cim motors
**
-4
 
 
== Impact ==
 
*Weight remaining
**
Unknown
 
*Cim motors remaining
**
2
 


= Sub-Team Mentors =
= Sub-Team Mentors =


-Fill in here
*


= Student Members =
= Student Members =


*Fill in names
*
**
-And sub-team (electric, mechanical, etc.)
 
*Raymond Healy
**
Programming

Revision as of 13:06, 12 January 2014

To Do

Goals

Completed Goals

Design Specifications

Equipment Requirements/Size

Sub-Team Mentors

Student Members