2009:Ccontrols20309

From 1511Wookiee
Revision as of 12:17, 14 November 2010 by Heydowns (talk | contribs) (Ccontrols20309 moved to 2009:Ccontrols20309)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Date: 2/3/09

Start Time: 6:30 PM

End Time: 9:30 PM

Members Present: Nick, (Eric), (Dean)

Tasks Completed:

1. Painted Secondary Control Box

2. Completed drawings for Top Plate L Brackets, Drawer Slide L Brackets and Bottom Box Plate

3. Submitted the drawings to Harris' Shop

Tasks to Complete:

1. Top Cover needs to be finalized and submitted.

2. Joy Stick Platform needs to be finalized and submitted

3. Controls need to be added to the true box.