2009:Electrical Main 2.5.09
2.5.2009
Start time: 6:40pm
End time: 9pm
Members present: Michael H, Sean K, Rika L, Crystal V, Apples, Oranges
Burlone's Marching Orders of the Night:(¬O_o)¬
1. Battery Box - Rika/Cuyler
2. Remount Electrical (Saturday) -- Group
3. Terminate / Leave one end long (6 AGW wires should be soldered) (i.e Speed controllers, cRIO)
-PWM cabled will be used from kit, any other long lengths will be custom terminated.
Banner Sensor Configuration:
Put together a wiring harness and use 7100's as an example - Sillyscope
4. Continue velcroing the board -- Group
5. Create Battery strap - Rika
6. Mouse Encoders - Mike and Crystal
7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean
Stuff in the Process
-Schope is looking for sketmatics for our banner sensors
-Dave and Josh are working on measuring out wiring in inventor
-Rika and Cuyler are collaborating about the battery box
-Mike and Crystal will be in the shop working on the board, velcroing, prepping wires, ect.
Completed
-Banner Sensor Schematic (h/t Oranges and Sean)