2009:Field/Crate 2.3.2009

From 1511Wookiee
Revision as of 13:38, 14 November 2010 by Heydowns (talk | contribs) (Field/Crate 2.3.2009 moved to 2009:Field/Crate 2.3.2009)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

2/3/09


Start Time: 6:00pm

End Time: 9:00pm


Members Working: Theo, Amy, Kevin


Tasks Completed:

1.) Floor, Roof, and Sides of crate assembled


Tasks to do:

1.) Shelf supports and shelves

2.) Paint Crate

3.) Vison targets