2009:Electrical Main 2.7.09

From 1511Wookiee
Revision as of 13:38, 14 November 2010 by Heydowns (talk | contribs) (Electrical Main 2.7.09 moved to 2009:Electrical Main 2.7.09)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

2.7.09

Start time: 9am

End time:10pm

Members present: Dave, Dave, Rika, Sean, Collin, Crystal, Michel (Me-shell) Shell-logo.gif


Tasks Completed:

  • Finished soldering and wiring a mouse
  • Mounted mouse on robot
  • Started second mouse
  • Battery box is completed and made and painted!
  • Cut/prepped wires for final design
  • Wires BaneBot motors and Window motor
  • Completed on-board power wires
  • Completed all lengths of Controller->Motor wires


Goals:

PLEASE VIEW MASTER TASK LIST FOR PRIORITY!

-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge

-Finish up as many pwm cables as possible

-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?

-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.



You guys are amazing keep it up!