2009:Electrical Main 2.9.09
From 1511Wookiee
Jump to navigationJump to search
Start time: 6pm
End time: 9:30pm
Member's present: Crystal, Apples, Oranges, Karen
Night's summary:
- We drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on. Board is bolted on robot.
- Dave B. & Jeff drilled some more holes for the battery box so it could be slid over to help balance the robot weight.
- we had some of the yummy cake Crystal brought.