2009:Electrical Main 2.9.09

From 1511Wookiee
Revision as of 13:38, 14 November 2010 by Heydowns (talk | contribs) (Electrical Main 2.9.09 moved to 2009:Electrical Main 2.9.09)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

 Start time: 6pm

End time: 9:30pm

Member's present: Crystal, Apples, Oranges, Karen 


Night's summary:

  • Crystal & Dave S. drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on.   Board is bolted on robot.
  • Dave B. & Jeff drilled some more holes for the battery box so it could be slid over to help balance the robot weight.
  • we had some of the yummy cake Crystal brought.