2010:Mechanical 2 01.21

From 1511Wookiee
Revision as of 17:58, 21 January 2010 by Mechanical2 (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

XX.XX.2010

Start time: 6:45 PM

End time:

Members present: Alex Wolf, Mike Montemalo, Vaun Thompson,

Members Attending Next Meeting: Mike M...


Tasks Completed:

  •  attached the electrical bord to the left side of the bot.
  • We attached a wormdrive gearbox to the rear of the bot to power the kicking mechanism.
  • We changed the superstructure rear frame and ridgidized it to compensate for the wormdrive gearbox.



Tasks In Progress:

  • attaching a mount to hold the battery
  • working on connecting all parts of the kicking mechanism (belt, gearbox, etc.) 



Tasks to Complete:

  • We need to finish and test the two position shooter
  • We need to put all known parts on Inventer.
  • task



Materials Needed:

  • N/A
  • item

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

1-21-10.JPG(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)