2010:Electrical Main 01.23

From 1511Wookiee
Revision as of 09:24, 24 January 2010 by ElectricalMain (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

01.23.2010

Start time:  10:00

End time: 8:00

Members present: Michael Hartman, Tom Powers, Vaughn Thompson, Dave B., Dave S., Dean S.

Members Attending Next Meeting:


Tasks Completed:

  • Pneumatics mock board completed
  • Pneumatic CRIO module "bumper" located 
  • Added to mock board wiring - Victor speed controller for kicker motor and relay for kicker clutch



Tasks to Complete:

  • BOM
  • Shopping List



Materials Needed:

  • more pneumatics solenoids (only if pneumatics is used)
  • Jaguars for spares, possibly more depending on what we decide to use on other motors
  • Possibly more victors if we decide one is needed for the beater bars, but possibly only going to use a spike relay

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)