2010:Electrical Main 02.02

From 1511Wookiee
Revision as of 16:57, 2 February 2010 by ElectricalMain (talk | contribs)
Jump to navigationJump to search

02.02.2010

Start time:

End time:

Members present:

Members Attending Next Meeting:


Tasks Completed:

  • task
  • task



Tasks In Progress:

  • task
  • task



Tasks to Complete:

  • task
  • task



Materials Needed:

  • item
  • item

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)

Battery Placement
cRIO Placement
Mock Electrical Board Positioning